Opening of Gates 3.1 and 3.2 at the Loyola Heights campus (CSMO Memo)
19 Apr 2023 | Campus Safety and Mobility Office (CSMO)
19 April 2023
MEMO TO:
The University Community
FROM:
[Sgd] Josephy F. Almosera
Director, Campus Safety and Mobility Office
RE:
Opening of Gates 3.1 and 3.2
We would like to inform the community that effective 24 April 2023, our new Gates 3.1 and 3.2 will be open for use by vehicular traffic.
Gate 3.1 is an entrance gate that may be used by all vehicles with valid Ateneo gate pass stickers coming from the north, or the UP/Commonwealth Avenue area.
Gate 3.2 is an exit gate that may be used by all vehicles going southbound towards Aurora Blvd/White Plains via our Northwest Diversion Road.
These gates will be open from 5 am to 10 pm, Monday to Saturday.
In conjunction with the opening of these two new gates, we will be implementing a revised traffic scheme for the Loyola Heights campus. Directional signs will be installed throughout our campus to guide everyone.
For detailed information regarding this new traffic scheme, please click on the link below:
https://www.ateneo.edu/safety/campus/loyola-heights/traffic-scheme
We ask for everyone's patience as we transition to this new traffic scheme, which we hope will, in the long term, improve traffic flow in and out of our campus.
Thank you for your cooperation.